Cortec’s Boiler Egg™ is designed to scavenge oxygen and passivate metal during the initial filling of makeup water after seasonal or long-term dry layup of boilers. The Boiler Egg™ comes in an easy-to-handle pouch that is readily dissolved upon water contact, releasing the active ingredients as the boiler is being filled. It protects against the threat of oxygen pitting during the critical startup phase of a boiler when the makeup water is normally not pre-heated and the operating chemical program has not yet been implemented.
The Boiler Egg™ can be used in conjunction with the Boiler Lizard® as a complete preservation kit for dry layup of boilers, or it can be used on its own for applications where oxygen scavenging and metal passivation are needed during the equipment startup phase.
Package and Storage:The Boiler Egg™ is available in carton tubes (one bag per tube).
Tube – 3” D x 37” L (8 cm x 94 cm) Bag – 4” W x 34” L (10 cm x 86 cm)
To ensure best product performance, store in original packaging, indoors, and out of direct sunlight at 40-100 °F (4-38 °C). Shelf life: 2 years
Product Data Sheet
Contact us!